Focused on Expertise Since 1989
Horizontal Directional Drilling Contractor in Calgary
Some utilities can’t be trenched: under a highway, beneath rail lines, across an environmentally sensitive waterway, or through an established neighbourhood where tearing up the street isn’t an option. That’s where horizontal directional drilling (HDD) earns its keep, and where BRT Construction has built one of Alberta’s most experienced trenchless crews.

Versatile Services

Get your Budget
What HDD does
Directional drilling installs conduit and cable underground along a steered bore path, entering and exiting through two small pits instead of an open trench. Roads stay open. Landscaping stays intact. Rail traffic never stops. We bore under roads, railways, rivers, parking lots, and existing structures, then pull back conduit for power, fibre, gas, and telecommunications.
Fibre, telecom, and rural connectivity
BRT is a key partner in bringing high-speed fibre to rural Alberta communities and First Nations lands. Our drilling and ploughing crews have installed utility connections across the province for major telecommunications providers, including long rural runs where production speed makes or breaks the budget. For open-country installs, our cable ploughing offers an even faster trenchless option.
Turnkey trenchless, one contractor
We don’t just bore the hole. BRT handles hydrovac daylighting of crossings, drilling, conduit pullback, cable pulling and splicing, and final surface repair, one point of contact from locate to livening. For projects that mix trenchless and open-cut, our excavation crews work the same site under the same supervision.
Urban experience that matters
Drilling in Calgary means drilling around everything already underground. Our operators work congested utility corridors daily, with shot plans built from daylighted locates, not guesses. It’s why engineers spec us for crossings other contractors pass on.
FAQs
What is horizontal directional drilling?
HDD is a trenchless method of installing underground utilities. A steerable drill head bores a pilot hole along a planned path between an entry and exit pit, the hole is enlarged, and the conduit or cable is pulled back through, all without opening a trench across the surface. It’s the standard method for crossing roads, railways, and waterways.
When is HDD better than open trenching?
HDD is the better choice when the route crosses something you can’t or shouldn’t dig up: roads and highways, rail lines, rivers and creeks, wetlands, mature trees, or finished driveways and landscaping. It avoids lane closures and pavement cuts, cuts restoration work, and keeps ground disturbance to the entry and exit pits. Open trenching is usually more economical for long runs across open ground, or when several utilities share one trench. Many projects use both, and we’ll recommend the right method for each section of the route.
How far and how deep can you drill?
Typical shallow-utility bores run from short road crossings up to about 150 metres in a single shot, at depths set by the crossing design and ground conditions. Bore lengths and diameters depend on soil, product size, and setback requirements, we assess each crossing individually and have the fleet to scale up.
Does drilling damage the surface above?
A properly planned bore leaves the surface untouched between entry and exit pits. We daylight existing utilities along the path, monitor drilling fluid pressures to prevent frac-outs, and restore both pits completely on completion.