BRT Construction installs Transmission, and High Voltage Power Ducts and Duct Banks for any sized project. BRT has worked on high profile sites, as well as building sites for many clients including private and utility. These Duct structures often include Precast or custom built Manholes and Pullboxes.
Duct Banks
BRT Construction has been completing Duct Banks since its inception, and are experts at concrete encased, direct buried, and tie ins to existing structures. BRT has worked around existing utilities to augment, or install new structures to expand or create duct raceways for any use
Indigenous Lands Fibre to the home
BRT Construction has worked on Indigenous Lands for the last 3 Years installing Fibre to every home. We work closely with Cabling companies to provide a complete service that is ready to use. This dramatically improves connectivity in an area that typically does not have very robust communication services
Telus: Fibre to the Home
Project Description BRT Construction Services is currently playing a large role in connecting the end user to the new fiber distribution networks that local telecoms are building.
Western Alberta Transmission Line
Project Description BRT Construction Services Ltd. built all of the concrete caisson and grillage foundations from Langdon to Innisfail for an Altalink project to improve the efficiency of the transmission system and avoid system congestion.
Public Works Canada & BC Hydro
Sinclair Canyon High Voltage Upgrade The purpose of this project was to build a 3km electrical raceway from Radium Hot springs to the Public Works Highway Maintenance and Parks Office to replace a primary cable that was failing due to age. This involved trenching along the highway on either side of the tunnel in addition …
Calgary Ring Road Street Lighting
Project Description BRT Construction Services worked alongside an electrical contractor to install all of the cable and streetlight foundation for the Northwest and Northeast sections of Stony Trail. BRT also installed all the underground streetlight cable on the Southeast section of the Ring Road Project.
Shepard Energy 25SUB Switchyard
Project Description BRT Construction Services Ltd. built all the concrete foundations and underground distribution for the switchyard at the Shepard Energy Center. This switchyard connects the generation plant to Altalink’s transmission grid.
Telus TV
Project Description During the inception of TELUS’ Optik TV, BRT Construction Services not only placed several hundred kilometres of large volume fiber optic cable in Calgary but also aided with splicing the network connections in the Greater Vancouver Area
Alberta SuperNET
Project Description The SuperNet was built to connect public institutions (schools, hospitals, colleges, universities, libraries, and municipal offices) to a broadband network for high-speed internet access, video conferencing, and other services. Many Internet Service Providers (ISPs) also use it to deliver internet services to rural consumers. It’s a network of fibre optic cables and wireless …